Skip to main content

Current Projects and Leaks

The image shows a rusty metal pipe with a notable hole, alongside a person's legs and some equipment in the background.
12" Ductile Iron Failure on Lathrop St.
Rusty, clogged pipe section with corrosion and mineral buildup visible inside.
Condition of old 4" water main on Pittroff Ave.

In an effort to  continue our water main replacement committment, we completed replaced 900 ft. of  8" Transite with 8" C-909 PVC water main on Fairview St.  The new main will provide many years of uninterrupted water service to those residents.  We wanted to replace the main before a final paving project is perfomed through the DPW.

We are in the final stages of the plans and specifications for the re-painting of our Alvord St. water tank. We are hoping to bid the project in january of 2027 and begin the project in April of 2027. We are thankful for a 10-year interest free loan from the Massachusetts Water Resource Authority.

We will continue installing radios on our water meters throughout various locations in the District during the year as funds and time allow. The radios reduce meter reading time.

We will continue to paint our fire hydrants as time allows along with other maintenance items.  If you see a hydrant that needs attention, please call our office. If you see any suspicious activity around fire hydrants, please call the police dept. immediately.

Join our mailing list